Well only 8 work days* until the work year ends and after another hectic year we are all looking forward to the break over the festive period.
We are also looking forward to our Christmas Party night which will take place on Friday 18th at The Grange Manor Hotel in Grangemouth.
Next year is already looking busy but before then bring on the Christmas and New Year festivities.
Everyone at Stirling Electrical Services wishes our clients a very Merry Christmas and wish them all a good and prosperous New Year.
* We will have an electrician working in between Christmas and New Year for emergency cover work.
Our Latest Twitter Updates
Showing posts with label work. Show all posts
Showing posts with label work. Show all posts
Saturday, 12 December 2009
Sunday, 4 May 2008
Building Warrant Work in Scotland
In May 2005, a new system was brought in to enforce the Building Regulations in Scotland.
It aims to improve the standard of building work. The new system includes rules for electrical installations, which has been controlled by the Building Regulations for many years.
Under the new system, any electrical work carried out under a building warrant (the legal permission you need from the local authority to start building work) will either have to be approved by a registered installer (known formally as an ‘approved certifier’) or be checked by the local authority. What is the building standards system in Scotland?
Stirling Electrical Services Ltd. are an Approved Body and employ Approved Certifiers - full information on the service we provide for Building Warrant Work can be found on our website
You can find full details about the building standards system in Scotland on the Scottish Building Standards website at www.sbsa.gov.uk.
For even more information you can download this excellent leaflet by The Electrical Safety Council on the Building Standards in Scotland.
It aims to improve the standard of building work. The new system includes rules for electrical installations, which has been controlled by the Building Regulations for many years.
Under the new system, any electrical work carried out under a building warrant (the legal permission you need from the local authority to start building work) will either have to be approved by a registered installer (known formally as an ‘approved certifier’) or be checked by the local authority. What is the building standards system in Scotland?
Stirling Electrical Services Ltd. are an Approved Body and employ Approved Certifiers - full information on the service we provide for Building Warrant Work can be found on our website
You can find full details about the building standards system in Scotland on the Scottish Building Standards website at www.sbsa.gov.uk.
For even more information you can download this excellent leaflet by The Electrical Safety Council on the Building Standards in Scotland.
Labels:
building,
construction,
electrical,
electricity,
scotland,
warrant,
work
Thursday, 31 January 2008
Photo Updates
January is nearly over and 2008 is already one month down. This time of year is always very busy for us at Stirling Electrical Services Ltd. and I have not had much time to blog. I'm determined to find time in our busy schedule to post on here so look out for more posts in February.
Until the next post here are a couple of links to photos.
The first link is from my New Year trip to Isle of Bute with my wife Jennie, where we stayed at St Blanes Hotel, Kilchattan Bay. click to view photos
And one of the many jobs in January was to carry out the electrical, networking and audio visual work in converting a foyer space at the Falkirk Wheel into an Information Centre - click for a few photos of our work
Until the next post here are a couple of links to photos.
The first link is from my New Year trip to Isle of Bute with my wife Jennie, where we stayed at St Blanes Hotel, Kilchattan Bay. click to view photos
And one of the many jobs in January was to carry out the electrical, networking and audio visual work in converting a foyer space at the Falkirk Wheel into an Information Centre - click for a few photos of our work
Monday, 7 January 2008
We're All Back
Technically today is our first official working day of 2008, so it would be remiss of me not to wish you all a Happy New Year and wish you all the best for the coming year.
I say today is our first official working day as its today when we are back to a full workforce after most of the team arrive back at work since the festive break. For two of us though and that includes myself, we have been working over the break, either on stand by or on designated working days within the break.
So it was good to be back to a full workforce today and any hopes that we would be eased back in gently were wishful thinking as its been a hectic day with many jobs and enquiries coming in thick and fast - infact it seems as if everyone had their phones on a timer and scheduled to call us today - but would and we have it any other way? - of course we wouldn't.
Its good to be back, so if you've been putting off that little electrical job, well now is the time to call us.
Happy New Year
So yes its good to be back and
I say today is our first official working day as its today when we are back to a full workforce after most of the team arrive back at work since the festive break. For two of us though and that includes myself, we have been working over the break, either on stand by or on designated working days within the break.
So it was good to be back to a full workforce today and any hopes that we would be eased back in gently were wishful thinking as its been a hectic day with many jobs and enquiries coming in thick and fast - infact it seems as if everyone had their phones on a timer and scheduled to call us today - but would and we have it any other way? - of course we wouldn't.
Its good to be back, so if you've been putting off that little electrical job, well now is the time to call us.
Happy New Year
So yes its good to be back and
Friday, 23 March 2007
Easter Mania
Well here we are in the run up to Easter and it's looking like the hectic past two and a half months is going to come to a head over the next two weeks. One client wanted us to do a two week job in late January and we are still there two months on after the job grew arms and legs (not that im really complaining). The cafe we refurbed opens on Wednesday as does the Steamship which we done various maintenance work on.
Work on a newly built log cabin will need to be completed within a fortnight as the owner has guests arriving on Easter Saturday, so as well as these two jobs and what feels like zillions of others(well there is a quite a few really), its going to be a busy two weeks for our team.
Im sure after all the hard work, my lovely wife may allow me an Easter Egg this year.
Work on a newly built log cabin will need to be completed within a fortnight as the owner has guests arriving on Easter Saturday, so as well as these two jobs and what feels like zillions of others(well there is a quite a few really), its going to be a busy two weeks for our team.
Im sure after all the hard work, my lovely wife may allow me an Easter Egg this year.
Subscribe to:
Posts (Atom)
Contact Details for Stirling Electrical Services Ltd.
Stirling Electrical Services Ltd
12 Queen Street
Fallin
Stirlingshire, FK7 7JG
Tel: 01786 813916, Fax:01786 811447
Web: www.stirlingelectrical.co.uk
Email: info@stirlingelectrical.co.uk